You can level an existing concrete floor with a leveling layer of new concrete but you must prepare the old concrete floor first.
Using concret to level a flat stone wall.
After spreading the mortar but before laying the next stone use the trowel edge to cut the mortar even with wall face.
A stone wall assembled without mortar has a lot of crevices to plant in.
Higher walls should be engineered for stability.
This prevents mortar from running down the face of the wall.
Use a hand or power tamper to level the base.
Keep these new garden beds or retaining walls less than three feet high and they are ideal winter garden projects.
This tutorial is designed for beginners interested in building stone retaining walls using a dry stack method but it also works for retaining block and flagstone walls.
You can build a stone wall with natural fieldstone that you have on your property provided the stones are flat enough for stacking.
This is the part 2 video of us showing how to apply the stone ledgers under the cantilever ledge to give your walls houses block walls or whatever you want.
Make sure the braces are level and lay down a barrier of wire mesh over the existing concrete inside of the barrier.
Flat or cut stones are much easier to work with than fieldstone and will make a sturdier wall.
For this 18 inch high wall the footing should be at least 18 inches wide.
Excavate to a depth of 6 inches along the entire base of the stone retaining wall using the string marker as a guide.
Many walls are somewhat uneven.
If you have to buy stone choose a flat stone such as flagstone or a cut stone like ashlar.
If the wall stands at a tilt take it out and level out the bottom of the trench then reinsert the wall.
To lay new concrete sweep and clean the old concrete and saturate the old concrete with water.
Or fill gaps with soil and plant fragrant herbs for cushions.
Using your stakes string and line level mark the height of the capstone.
How to tile an uneven wall.
If you want to sit on the wall choose smooth flat stones.
If you re tiling over an uneven section of wall the.
Make sure that the terrace wall does not come up to more than 2 feet 0 61 m above ground level unless you re using strong stone or concrete blocks.
Other materials that could be used for such a project.
For dry stack walls the base should be as wide as the wall is tall.
Neglecting to prepare the old surface will prevent the new concrete from adhering correctly resulting in a weak bond between the two layers.
A planted capstone.
The key to building a wall using mortar is when you apply the mortar it needs to go evenly onto the run of stones that are set.